Construction Management Engineering

MEP Engineering Basics | MEP Construction Sequence [PDF]

In MEP  works we had the following section by which we monitor the site progress:

  • Slab Works – Any Work in the Slab – like Electrical Conduit Laying, Sleeve for Pipes & Ducts.
  • MEP 1st Fix – Anything on the Blockwork before Plastering – usually Pipework, Conduit Works, GI Box, Sleeves, Drainage Work in Toilet, Kitchen after which the plastering would be done.
  • MEP 2nd Fix – Anything before the false ceiling works- like Wire Pulling, Support Work, Pipe Work – Water, Drainage, Chilled Water Pipes, Including Pressure Test. Water Heater Installation, GI Conduit, Cable Tray, Cable Pulling, Fire Fighting Pipe Work, FCU fixing, Ducting, DB, MDB Wiring and Termination
  • MEP 3rd Fix – After False Ceiling is Done – Light fixture Installation, Switch Board, Grills & Diffusers for HVAC, Toilet Fixtures fire fighting sprinklers & all other finishing works.
  • Pre-Commissioning
  • Commissioning